top of page

130 East End Avenue

Full Design & Full Time Construction Support Services
Anchor 1

Investigation, Construction Document preparation and Construction Administration on the $1 million plus construction package that included all LL11/98 conformance requirements through façade repair and bridging. Water infiltration through the facade and water tables and bulkhead, repair with the replacement of all decorative cast stone elements.

                       

Owner: 130 East End Owner's Corporation
bottom of page